HUD Compliance
HUD MOR Preparation Checklist: Form 9834 and Review Readiness
What Form HUD-9834 reviews, the evidence to assemble, and an optional 60-day preparation plan for HUD Multifamily owners and managers.
A Management and Occupancy Review (MOR) evaluates whether a HUD Multifamily property’s management practices and records meet applicable program requirements. Preparing tenant files is only part of the work: Form HUD-9834 also covers maintenance, inspection follow-up, resident relations, and management oversight.
Use this checklist to assemble evidence by review area, identify gaps, and assign corrections. It is designed for HUD Multifamily MOR preparation; it is not a substitute for a separate LIHTC monitoring review, a PHA’s PBV requirements, or an NSPIRE inspection.
Need the checklist applied to your property? See Altus Compliance’s MOR preparation and corrective action service.
Jump to: review scope · Form 9834 checklist · tenant files and EIV · HOTMA · preparation timeline · corrective actions.
Before you start: confirm the MOR scope
- Review notice and document request. Confirm the date, reviewer, programs, applicable addenda, and requested records. Use the reviewer’s request and Addendum C to build an evidence index; confirm the file-selection process rather than assuming your internal sample will match it.
- Prior findings. Locate the last MOR report, response, assigned deadlines, and written closure evidence. Separate completed corrections from unresolved items and recurring process gaps.
- On-site access and confidentiality. HUD’s PBCA procedures require on-site review of tenant files, waiting lists, and EIV master files and prohibit their off-site transfer, electronically or physically. Arrange secured on-site access for authorized reviewers; do not email these records or upload them to an off-site review folder.
Source: HUD’s required and alternative PBCA MOR procedures, effective for reviews scheduled on or after January 1, 2024. An independent consulting engagement does not itself authorize access to EIV data.
Form HUD-9834 preparation checklist
The published HUD-9834 form has a desk review, on-site review with addenda, and summary report. Confirm the applicable version through HUD’s forms library and your reviewer; the currently linked form is dated June 2016 and displays an older OMB expiration date.
- A. General Appearance and Security. Walk buildings, grounds, and common areas. Check lighting, security procedures, and observable conditions; record defects, assigned repairs, and completion evidence.
- B. Follow-up and Monitoring of Project Inspections. Assemble prior physical-inspection findings, repair records, and follow-up evidence, including applicable lead-based-paint obligations. Keep separate physical-inspection correction requirements on their own calendar.
- C. Maintenance and Standard Operating Procedures. Review work orders, response records, preventive maintenance, unit turnover, and energy-conservation practices. Compare actual dates and work completed with written procedures.
- D. Financial Management/Procurement — where applicable. Prepare the financial and procurement records required for a HUD staff or mortgagee review. Form 9834 expressly excludes this category from contract-administrator scoring; do not assume a PBCA evaluates the whole financial category.
- E. Leasing and Occupancy. Check tenant selection plans, waiting lists, applications, screening, leases and deposits, terminations, EIV, TRACS, file security, certifications, and rent calculations. Tenant-file review and Addendum A belong here, not in a separate rating category.
- F. Tenant/Management Relations. Produce complaint records, documented resolutions, and applicable tenant-service records. Confirm staff can explain the complaint-handling process.
- G. General Management Practices. Review staffing, training, owner/agent oversight, and written procedures. Identify who owns each recurring compliance task and how completion is checked.
- Applicable civil-rights and resident-protection documents. Check affirmative marketing, accessibility and reasonable-accommodation procedures, fair-housing information, and VAWA documentation. Addendum B collects civil-rights information; the MOR summary is not itself a determination of compliance with fair-housing laws.
How scoring works: Form 9834 assigns scores to applicable categories and provides five overall ratings, from Superior to Unsatisfactory. The overall calculation adjusts for the categories actually reviewed. A preparation checklist is not a points guarantee; exclusions and reviewer scope matter.
Tenant-file and EIV evidence to check
- Certifications and supporting verification. Trace move-in, annual, and interim certifications to supporting income and asset documents, calculations, household information, signatures, and effective dates. Apply the verification rules in effect for that certification, including applicable EIV and HOTMA guidance.
- Recertification timing and exceptions. Check required notices, effective dates, processing records, and the reason for any delay. Distinguish owner processing failures from tenant nonresponse and other circumstances under applicable HUD rules; avoid treating every delay as identical.
- Rent, assistance, and TRACS. Reconcile the certification, lease, applicable utility allowance, rent and assistance calculations, and submission history. Document unresolved discrepancies and the action taken.
- EIV report use and resolution. Check each required report’s run frequency, review evidence, and documented discrepancy resolution. Retain report-specific records rather than relying on a policy without proof it was followed.
- Authorized access and retention. Verify access authorization, security training, Rules of Behavior, secure storage, and disposal. EIV master reports generally have a three-year retention period; specified tenant-file reports and supporting documents are retained for tenancy plus three years. Existing Tenant Search records depend on whether the applicant was admitted.
Check exact report-use and retention requirements in Handbook 4350.3, Chapter 9 and Exhibit 9-5. Do not distribute EIV reports to an outside consultant merely because a review has been commissioned.
HOTMA: check policy readiness separately from the deadline
As checked October 23, 2026, Notice H 2025-07 sets January 1, 2027 as the full-compliance date for applicable HUD Multifamily income certifications. Use the current implementation notice, H 2023-10 Revision 3, for substantive guidance.
The extension does not erase earlier policy-update obligations. HUD’s HOTMA FAQ, questions 2–3, distinguishes policy findings from transitional tenant-file observations and identifies the May 31, 2024 TSP/EIV-policy requirement. That FAQ is dated August 2025 and contains superseded compliance dates elsewhere; read it with H 2025-07, not as a source for the current deadline or TRACS release status.
- Policy versions and implementation evidence. Keep applicable pre-HOTMA and HOTMA-compliant tenant selection plans and EIV procedures available for the reviewer. Document the property’s implementation status and which rules apply to each certification effective date.
- Operational readiness. Check staff training, software readiness, applicable forms, and current-year thresholds. Do not assume the Multifamily deadline applies unchanged to other funding programs.
An optional 60-day MOR preparation timeline
This is Altus’s suggested preparation schedule, not a HUD-required timeline or guaranteed notice period. Form 9834 calls for at least two weeks’ written notice, so your actual window may be shorter. Maintain compliance continuously and adapt the plan to the review notice.
- 60–45 days before: scope and assign. Confirm the review scope, create the section-by-section evidence index, revisit prior findings, and assign a person and completion date to each gap.
- 45–30 days before: test records. Use a risk-informed internal sample of certifications and supporting records. Include recent move-ins, interims, and known discrepancies without assuming this replaces the reviewer’s sample. Correct errors and preserve a clear correction trail.
- 30–15 days before: reconcile operations. Check policies against practice, EIV review evidence, deposit records, work orders, inspection follow-up, and unresolved TRACS issues. Recheck completed corrections.
- Final 15 days: confirm access and readiness. Walk the property, check applicable postings, arrange secure on-site records access, and confirm staff availability for the entrance conference and interviews. Keep unresolved items visible with a documented action plan.
How often is an MOR required?
It is not universally annual. For the seven covered Multifamily project-based Section 8 programs, HUD’s final performance-based schedule, Section III, sets intervals of 12, 24, or 36 months based on risk and the prior rating. HUD or the CA may review sooner when warranted; the notice also requires an MOR within six months of an ownership or management change. Confirm the schedule for your program and circumstances rather than applying it to every HUD-assisted property.
After the MOR: build a documented corrective action response
Track each finding against the response and target-completion dates in the report or applicable HUD/contract-administrator direction. Do not assume every finding has a 30-day correction deadline, and do not confuse an initial response with completed correction.
- Identify the issue and authority. Record the condition, cited requirement, cause, effect, and required corrective action, along with affected files or operations.
- Assign and prove the correction. Name the responsible person, track the assigned deadline, and attach permitted correction evidence. Include process changes that prevent recurrence, not just a statement that staff were reminded.
- Track follow-up to closure. Request any necessary extension before the assigned deadline, respond to follow-up requests, and retain written confirmation of closure. Keep separate inspection-hazard deadlines in view.
Form 9834’s instructions require findings and target completion dates, followed by reviewer follow-up until corrective actions are complete. Altus Compliance’s MOR preparation and corrective action support can help organize a mock review, prioritize gaps, and assemble a cited response. Independent preparation does not replace the official MOR or suspend existing correction obligations.
Related services
This article is provided for general information and does not constitute legal advice. Owners should consult program guidance and counsel for decisions affecting their properties.
